Drill Cuttings Re-Injection (CRI) Project Management Service
Terralog provides technical services & project management for injection of drill cuttings & waste fluids/muds. i.e. Cutting Re-Injection (CRI). Terralog's technical services group combines expertise in geomechanics, geology, rock mechanics, reservoir engineering, and environmental management with practical field experience in long-term deepwell injection operations. Terralog's CRI Project Management Service is built on our extensive experience in deep well disposal of upstream oil production wastes (e.g. produced sands, contaminated soils and tank bottoms).
Our CRI service includes complete project management and technical consulting in the following areas:
Technical Feasibility Studies:
Geological formation evaluations
Well completion design
Injection strategy design and implementation
Liaison with regulatory agencies for project permitting
Detailed area-of-review for project permitting
Preparation of applications for regulatory approvals
Cost assessments for CRI facilities and equipment.
Project management during CRI operations; Terralog will provide project management
relating to:
assessment and selection of required field equipment and injection
services;
supervision of CRI operations;
design and implementation of a process-monitoring program for process
control and evaluation of project performance;
technical support during field operations: analyses of monitoring and
injection data to optimize the injection strategy, to maintain formation
injectivity, and ensure material containment in the disposal formation;
regulatory liaison and project documentation.
Copyright ©2005 Terralog Technologies Inc., All Rights Reserved.
SFI™, Slurry Fracture Injection™, TTI™, Terralog™, and SFI-Slurry Fracture Injection™ are trademarks of Terralog Technologies Inc.
